Construction

  • January 31, 2024

    The internal directional signage is under repair in David King Hall and Exploratory Hall on the Fairfax Campus, and in Colgan Hall on the SciTech Campus.

  • January 25, 2024

    Upcoming traffic impacts and closures related to construction at Mason Square in late January and early February 2024.

  • January 25, 2024

    Rivanna River Way and nearby sidewalks have reopened near the Hub. Repairs are complete after a water main break. The ADA ramp at the main entrance to the Hub is also available.

  • January 22, 2024

    On George Mason University's Fairfax Campus, Rivanna River Way is temporarily closed near the Hub for repairs after a water main break. Sections of sidewalk at the main entrance to the Hub are currently closed, including the ADA ramp at that location. 

  • January 19, 2024

    The Hub and Rivanna River Way are temporarily closed for repairs after a domestic water main break to the Hub. The building and road closure will remain in effect until Monday, Jan. 22, at 8 a.m.

  • January 9, 2024

    Due to weather conditions, the road closure previously scheduled for this weekend on Founders Way North has been rescheduled.
    Founders Way North will be closed between the Van Metre Garage entrance and the west entrance to Vernon Smith Garage from Friday, Jan. 26, through Monday, Jan. 29. This section of roadway will be closed while a tower crane is removed from the construction site for Fuse at Mason Square.

  • November 15, 2023

    Contractors will work to clear a storm water pipe blockage at the intersection of Patriot Circle and Mattaponi River Lane on Thursday, Nov. 16. There will be traffic controls and heavy equipment in the area between 7 a.m. and 4 p.m. 

  • November 10, 2023

    Landscaping work is underway on the plaza at Mason Square through Friday, Nov. 17.

  • November 2, 2023

    The plaza at Mason Square will be closed for improvements starting Monday, Nov. 6, and will remain closed until March 2024. Construction fencing will block most of the plaza, but accessible pathways to the main entrance of Van Metre Hall will remain available near the plaza stage and near Hazel Hall. 

  • September 12, 2023

    The sidewalk along Fairfax Drive directly in front of the Fuse at Mason Square construction site will be closed starting this week through the rest of the fall semester. The pedestrian bridge between Washington Boulevard (near the north entrance to Vernon Smith Hall) and the FDIC plaza will have intermittent closures during September.