Campus Notice

  • May 10, 2024

    Contractors will complete sidewalk repairs behind Katherine Johnson Hall on George Mason University's SciTech Campus from Monday, May 13, through Monday, May 20. Work will occur each day between 6 a.m. and 6 p.m. Please avoid the area as there will be heavy equipment, trucks, and workers present. Traffic controls and safety protocols will be in place. 

  • May 8, 2024

    This summer, parking areas on George Mason University's Fairfax Campus will be milled, paved, and striped. The following schedule is subject to change based on weather and existing conditions. Signage about closures will be posted at parking lot entrances.

  • May 6, 2024

    George Mason University Spring Commencement will take place on Thursday, May 9, at 10 a.m. in EagleBank Arena on the Fairfax Campus. Separate Degree Celebrations will honor school and college graduates from Thursday, May 9, through Saturday, May 11, at the Fairfax Campus and Mason Square. Expect heavy traffic on and around campus.

  • May 3, 2024

    Heavy traffic is expected on the Fairfax Campus for regional high school graduation ceremonies at EagleBank Arena from May 29 through June 18. EagleBank will host up to three ceremonies on many days, so traffic will be entering and exiting campus from 8 a.m. until 10 p.m. Please allow extra travel time on and near campus.

  • April 24, 2024

    Contractors for Fairfax County will complete a routine survey of sewer lines on Mason’s Fairfax Campus over the next four weeks. This will require intermittent road and sidewalk closures as crews move around campus.

  • April 2, 2024

    Construction noise and traffic changes on Fairfax Drive can be expected at Mason Square during the month of April.

  • March 27, 2024

    Helicopter landings are scheduled at the West Campus parking lot on the Fairfax Campus on two upcoming dates, as part of ROTC training exercises.

  • March 22, 2024

    The elevator in the Aquatic and Fitness Center (AFC) at George Mason University is currently out of service for repairs. These repairs are expected to continue for at least 30 days. 

  • March 12, 2024

    On the evenings of Wednesday, March 13, and Thursday, March 14, there will be an increased volume in traffic on and around the Fairfax Campus, as well as an increase in on-campus parking, due to events at EagleBank Arena, with 5,000 attendees expected.

  • March 11, 2024

    Contractors will complete concrete chipping on the basement level of the Van Metre Garage on Monday, March 11, and Tuesday, March 12. Building occupants may experience loud noise throughout the building during this work.