Master Plan https://construction.gmu.edu/ en Stream restoration on Fairfax Campus will create scenic pathway https://construction.gmu.edu/news/2022-08/stream-restoration-fairfax-campus-will-create-scenic-pathway <span>Stream restoration on Fairfax Campus will create scenic pathway</span> <span><span lang="" about="/user/211" typeof="schema:Person" property="schema:name" datatype="">Colleen Rich</span></span> <span>Mon, 08/01/2022 - 12:15</span> <div class="layout layout--gmu layout--twocol-section layout--twocol-section--30-70"> <div class="layout__region region-first"> </div> <div class="layout__region region-second"> <div data-block-plugin-id="field_block:node:news_release:body" class="block block-layout-builder block-field-blocknodenews-releasebody"> <div class="field field--name-body field--type-text-with-summary field--label-visually_hidden"> <div class="field__label visually-hidden">Body</div> <div class="field__item"><figure role="group" class="align-right"><div> <div class="field field--name-image field--type-image field--label-hidden field__item"> <img src="/sites/g/files/yyqcgq306/files/styles/small_content_image/public/2022-08/Stream%20restoration%20image%201.jpg?itok=tJhr4N9u" width="350" height="259" alt="image of map showing the project" loading="lazy" typeof="foaf:Image" /></div> </div> <figcaption>Map showing the restoration project. Photo provided by Mason Facilities</figcaption></figure><p class="x"><span><span><span><span><span><span>Work has begun on the “Necklace Phase One and Stream Restoration” project on George Mason University’s Fairfax Campus, Mason Facilities announced.</span></span></span></span></span></span></p> <p class="x"><span><span><span><span><span><span>The project includes the restoration of the main stream channel, as well as adjacent tributaries, beginning at the southwestern corner of the Patriot Circle/Aquia Creek Lane intersection and finishing at the northern end of Mason Pond. </span></span></span></span></span></span></p> <p class="x"><span><span><span><span><span><span>It represents the next phase in Mason’s </span></span></span><span><a href="https://planning.gmu.edu/planning/master-plan/"><span><span>Master Plan</span></span></a></span><span><span><span>, which is the framework that guides decisions concerning the university’s physical environment.</span></span></span></span></span></span></p> <p class="x"><span><span><span><span><span><span>Illuminated, paved and mulched pedestrian trails will be constructed in addition to the restoration. Once this project is completed in late 2022, the Mason community will be able to enjoy a curated, scenic pathway from the intersection of Patriot Circle/Aquia Creek Lane to Mason Pond Drive.</span></span></span></span></span></span></p> <figure role="group" class="align-left"><div> <div class="field field--name-image field--type-image field--label-hidden field__item"> <img src="/sites/g/files/yyqcgq306/files/styles/small_content_image/public/2022-08/Stream%20restorationimage%202.jpg?itok=F1FMLEgO" width="350" height="197" alt="rendering of pathway" loading="lazy" typeof="foaf:Image" /></div> </div> <figcaption>Photo provided by Mason Facilities</figcaption></figure><p class="x"><span><span><span><span><span><span>The restoration process will ensure that Mason continues to be in compliance with state stormwater regulations, which support the revitalization of the Chesapeake Bay, while showcasing Mason’s forward trajectory within the Master Plan. In addition to following these laws, Mason’s goal is to achieve an environmentally sound and aesthetically vitalizing stream restoration for long-term stability and enjoyment.</span></span></span></span></span></span></p> <p class="x"><span><span><span><span><span><span>Natural features and techniques were utilized to develop a design that will mimic the characteristics of a stable, natural environment. Those features will also help stabilize the degraded stream. After removal of invasive foliage, a diverse mix of native vegetation and trees will be planted to reforest and help minimize erosion and improve water quality. </span></span></span></span></span></span></p> <p class="x"><span><span><span><span><span><span>These new features will be a welcome addition to Mason’s nationally accredited Arboretum, which includes labeled outdoor signs on Mason’s campuses.</span></span></span></span></span></span></p> </div> </div> </div> <div data-block-plugin-id="field_block:node:news_release:field_content_topics" class="block block-layout-builder block-field-blocknodenews-releasefield-content-topics"> <h2>Topics</h2> <div class="field field--name-field-content-topics field--type-entity-reference field--label-visually_hidden"> <div class="field__label visually-hidden">Topics</div> <div class='field__items'> <div class="field__item"><a href="/taxonomy/term/96" hreflang="en">Campus News</a></div> <div class="field__item"><a href="/taxonomy/term/241" hreflang="en">Facilities</a></div> <div class="field__item"><a href="/taxonomy/term/201" hreflang="en">Master Plan</a></div> <div class="field__item"><a href="/taxonomy/term/306" hreflang="en">Sustainability</a></div> <div class="field__item"><a href="/taxonomy/term/301" hreflang="en">Arboretum</a></div> <div class="field__item"><a href="/taxonomy/term/186" hreflang="en">Campus Improvements (Construction)</a></div> <div class="field__item"><a href="/taxonomy/term/71" hreflang="en">Construction</a></div> </div> </div> </div> </div> </div> Mon, 01 Aug 2022 16:15:48 +0000 Colleen Rich 701 at https://construction.gmu.edu